CHAPTER 16. ZONING AND PLANNINGCHAPTER 16. ZONING AND PLANNING\Article 4. Floodplain Management

Unless specifically defined in this Section 16-401 of the Code, the words or phrases used in this Article shall be interpreted so as to give them the same meaning they have in common usage and to give this Article its most reasonable application.

(a)   100-year flood see “Base flood.”

(b)   Accessory structure means a structure that is on the same parcel of property as the principal structure to be insured and the use of which is incidental to the use of the principal structure.

(c)   Administrator means the Federal Insurance Administrator.

(d)   Agency means the Federal Emergency Management Agency (FEMA).

(e)   Appeal means a request for review of the floodplain administrator’s interpretation of any provision of this Article or a request for a variance.

(f)    Area of special flood hazard or special flood hazard area is the land in the floodplain within a community subject to a one percent (1%) or greater chance of flooding in any given year.

(g)   Article means the following sections of the Code of the City:16-401, 16-402, 16-403, 16-404, 16-405, 16-406, 16-407, 16-408 and 16-409.

(h)   Base flood means the flood having a one percent (1%) chance of being equaled or exceeded in any given year.

(i)    Base flood elevation or BFE means the computed elevation to which floodwater is anticipated to rise during the base flood.

(j)    Basement means any area of the structure having its floor subgrade (below ground level) on all sides.

(k)   Building see “Structure.”

(l)    Chief Engineer means the Chief Engineer of the division of water resources, Kansas Department of Agriculture.

(m)  City means the City of Maize, Kansas.

(n)   City engineer means the City Engineer for the City;

(o)   Community means any state or area or political subdivision thereof, which has authority to adopt and enforce Floodplain Management Regulations for the areas within its jurisdiction.

(p)   Development means any man-made change to improved or unimproved real estate including, but not limited to, Buildings or other Structures, levees, levee systems, mining, dredging, filling, grading, paving, excavation or drilling operations, or storage of equipment or materials.

(q)   Elevated building means, for insurance purposes, a non-Basement Building which has its lowest elevated floor raised above ground level by foundation walls, shear walls, posts, piers, pilings, or columns.

(r)    Existing manufactured home park or subdivision means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including, at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed before the effective date of the floodplain management regulations adopted by a community.

(s)   Expansion to an existing manufactured home park or subdivision means the preparation of additional sites by the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads).

(t)    Flood or flooding means a general and temporary condition of partial or complete inundation of normally dry land areas from:(1) the overflow of inland waters; (2) the unusual and rapid accumulation or runoff of surface waters from any source; and (3) the collapse or subsidence of land along the shore of a lake or other body of water as a result of erosion or undermining caused by waves or currents of water exceeding anticipated cyclical levels or suddenly caused by an unusually high water level in a natural body of water, accompanied by a severe storm, or by an unanticipated force of nature, such as flash flood, or by some similarly unusual and unforeseeable event which results in flooding as defined above in item (1).

(u)   Flood boundary and floodway map or FBFM means an official map of a community on which the administrator has delineated both special flood hazard areas and the designated regulatory floodway.

(v)   Flood fringe means the area outside the floodway encroachment lines but still subject to inundation by the regulatory flood.

(w)  Flood hazard boundary map or FHBM means an official map of a community, issued by the administrator, where the boundaries of the flood areas having special flood hazards have been designated as (unnumbered or numbered) A zones.

(x)   Flood insurance rate map or FIRM means an official map of a community, on which the administrator has delineated both the special flood hazard areas and the risk premium zones applicable to the community.

(y)   Flood insurance study or FIS means an examination, evaluation and determination of flood hazards and, if appropriate, corresponding water surface elevations.

(z)   Floodplain or flood-prone area means any land area susceptible to being inundated by water from any source (see “flooding”).

(aa)  Floodplain management means the operation of an overall program of corrective and preventive measures for reducing flood damage including, but not limited to, emergency preparedness plans, flood control works, and floodplain management regulations.

(bb) Floodplain management regulations means zoning ordinances, subdivision regulations, building codes, health regulations, special purpose ordinances (such as floodplain and grading ordinances) and other applications of police power. The term describes such state or local regulations, or any combination thereof, that provide standards for the purpose of flood damage prevention and reduction.

(cc)  Floodproofing means any combination of structural and nonstructural additions, changes, or adjustments to structures that reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, or structures and their contents.

(dd) Floodway or regulatory floodway means the channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than one (1) foot.

(ee)  Floodway encroachment lines means the lines marking the limits of floodways on federal, state and local floodplain maps.

(ff)   Highest adjacent grade means the highest natural elevation of the ground surface prior to construction next to the proposed walls of a structure.

(gg) Historic structure means any structure that is (a) listed individually in the National Register of Historic Places (a listing maintained by the Department of Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register; (b) certified or preliminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the Secretary to qualify as a registered historic district; (c) individually listed on a state inventory of historic places in states with historic preservation programs which have been approved by the Secretary of the Interior; or (d) individually listed on a local inventory of historic places in communities with historic preservation programs that have been certified either (1) by an approved state program as determined by the Secretary of the Interior or (2) directly by the Secretary of the Interior in states without approved programs.

(hh) Lowest floor means the lowest floor of the lowest enclosed area, including Basement. An unfinished or flood-resistant enclosure, usable solely for parking of vehicles, building access, or storage, in an area other than a basement area, is not considered a building’s lowest floor, provided that such enclosure is not built so as to render the structure in violation of the applicable floodproofing design requirements of this Article.

(ii)   Manufactured home means a structure, transportable in one (1) or more sections, that is built on a permanent chassis and is designed for use with or without a permanent foundation when attached to the required utilities. The term “manufactured home” does not include a “recreational vehicle.”

(jj)   Manufactured home park or subdivision means a parcel (or contiguous parcels) of land divided into two (2) or more manufactured home lots for rent or sale.

(kk) Map means the flood hazard boundary map (FHBM), flood insurance rate map (FIRM), or the flood boundary and floodway map (FBFM) for a community issued by the Federal Emergency Management Agency (FEMA).

(ll)   Market value or fair market value means an estimate of what is fair, economic, just and equitable value under normal local market conditions.

(mm)         Mean sea level means, for purposes of the National Flood Insurance Program (NFIP), the National Geodetic Vertical Datum (NGVD) of 1929 or other datum, to which base flood elevations shown on a community’s flood insurance rate map (FIRM) are referenced.

(nn) New construction means, for the purposes of determining insurance rates, structures for which the start of construction commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, “new construction” means structures for which the start of construction commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.

(oo) New manufactured home park or subdivision means a manufactured home park or subdivision for which the construction of facilities for servicing the lot on which the manufactured homes are to be affixed (including at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed on or after the effective date of floodplain management regulations adopted by the community.

(pp) NFIP means the National Flood Insurance Program (NFIP).

(qq) Permit means a signed document from a designated community official authorizing development in a floodplain, including all necessary supporting documentation such as:(1) the site plan; (2) an elevation certificate; and (3) any other necessary or applicable approvals or authorizations from local, state or federal authorities.

(rr)   Person includes any individual or group of individuals, corporation, partnership, association, or any other entity, including federal, state, and local governments and agencies.

(ss)  Principally above ground means that at least fifty-one percent (51%) of the actual cash value of the structure, less land value, is above ground.

(tt)   Reasonably safe from flooding means base flood waters will not inundate the land or damage structures to be removed from the SFHA and that any subsurface waters related to the base flood will not damage existing or proposed buildings.

(uu) Recreational vehicle means a vehicle which is (a) built on a single chassis; (b) four hundred (400) square feet or less when measured at the largest horizontal projections; (c) designed to be self-propelled or permanently able to be towed by a light-duty truck; and (d) designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel, or seasonal use.

(vv) Remedy a violation means to bring the structure or other development into compliance with federal, state, or local floodplain management regulations; or, if this is not possible, to reduce the impacts of its noncompliance.

(ww)         Repetitive loss means flood-related damages sustained by a structure on two (2) separate occasions during a ten (10) year period for which the cost of repairs at the time of each such flood event, equals or exceeds twenty-five percent (25%) of the market value of the structure before the damage occurred.

(xx) Special flood hazard area see “area of special flood hazard.”

(yy) Start of construction includes substantial Improvements, and means the date the building permit was issued, provided the actual start of construction, repair, reconstruction, rehabilitation, addition placement, or other improvements were within one hundred eighty (180) days of the permit date. The actual start means either the first placement of permanent construction of a structure on a site, such as the pouring of slabs or footings, the installation of piles, the construction of columns, any work beyond the stage of excavation, or the placement of a manufactured home on a foundation. Permanent construction does not include land preparation, such as clearing, grading and filling, the installation of streets and/or walkways, excavation for a basement, footings, piers, foundations, the erection of temporary forms, nor installation on the property of accessory structures, such as garages or sheds not occupied as dwelling units or not part of the main structure. For substantial improvements, the actual start of construction means the first alteration of any wall, ceiling, floor or other structural part of a building, whether or not that alteration affects the external dimensions of the building.

(zz)  Structure means, for floodplain management purposes, a walled and roofed building, including a gas or liquid storage tank, that is principally above ground, as well as a manufactured home. “Structure,” for insurance purposes, means a walled and roofed building, other than a gas or liquid storage tank that is principally above ground and affixed to a permanent site, as well as a manufactured home on a permanent foundation. For the latter purpose, the term includes a building while in the course of construction, alteration or repair, but does not include building materials or supplies intended for use in such construction, alteration or repair, unless such materials or supplies are within an enclosed building on the premises.

(aaa)          Substantial damage means damage of any origin sustained by a structure whereby the cost of restoring the structure to pre-damaged condition would equal or exceed fifty percent (50%) of the market value of the structure before the damage occurred. Substantial damage includes repetitive loss buildings (see “repetitive loss”).

(bbb)         Substantial improvements means any reconstruction, rehabilitation, addition, or other improvement of a structure, the cost of which equals or exceeds fifty percent (50%) of the market value of the structure before start of construction of the improvement. This term includes structures which have incurred substantial damage, regardless of the actual repair work performed. The term does not, however, include either (1) any project for improvement of a structure to correct existing violations of state or local health, sanitary, or safety code specifications that have been identified by the local code enforcement official and which are the minimum necessary to assure safe living conditions, or (2) any alteration of a “historic structure,” provided that the alteration will not preclude the structure’s continued designation as a “historic structure.”

(ccc)          Variance means a grant of relief by the community from the terms of a floodplain management regulation. Flood insurance requirements remain in place for any varied use or structure and cannot be varied by the community.

(ddd)         Violation means the failure of a structure or other development to be fully compliant with the community’s floodplain management regulations. A structure or other development without the elevation certificate, other certifications, or other evidence of compliance required by this Article is presumed to be in violation until such time as that documentation is provided.

(eee)          Water Surface Elevation means the height, in relation to the National Geodetic Vertical Datum (NGVD) of 1929 (or other datum where specified) of floods of various magnitudes and frequencies in the floodplain.

(Ord. 925)

(a)   STATUTORY AUTHORIZATION.

The Legislature of the State of Kansas, in K.S.A. 12-741 et seq., and specifically in K.S.A. 12-766, has delegated to local government units the responsibility to adopt floodplain management regulations designed to protect the health, safety and general welfare; and

Chapter 16, Article 4 of the Code of the City of Maize, Kansas, was approved in draft form by the Chief Engineer of the Division of Water Resources of the Kansas Department of Agriculture on February 20, 2012; and

The amendment to Chapter 16, Article 4 of the Code of the City of Maize, Kansas, was approved in draft form by the Chief Engineer of the Division of Water Resources of the Kansas Department of Agriculture on, 2016;

(b)   FINDINGS OF FACT.

The special flood hazard areas of the City are subject to inundation which results in loss of life and property, health and safety hazards, disruption of commerce and governmental services, extraordinary public expenditures for flood protection and relief, and impairment of the tax base, all of which adversely affect the public health, safety and general welfare; and,

These flood losses are caused by (1) the cumulative effect of development in any delineated floodplain causing increases in flood heights and velocities; and (2) the occupancy of flood hazard areas by uses vulnerable to floods, hazardous to others, inadequately elevated, or otherwise unprotected from flood damages; and

The flood insurance study (FIS) that is the basis of this Article uses a standard engineering method of analyzing flood hazards, which consist of a series of interrelated steps as follows:

(1)   Selection of a Base Flood that is based upon engineering calculations, which permit a consideration of such flood factors as its expected frequency of occurrence, the area inundated, and the depth of inundation. The Base Flood selected for this Article is representative of large floods, which are characteristic of what can be expected to occur on the particular streams subject to this Article. The Base Flood is the flood that is estimated to have a one percent (1%) chance of being equaled or exceeded in any one year as delineated on the Federal Insurance Administrator’s FIS, and illustrative materials dated December 22, 2016, as amended, and any future revisions thereto.

(2)   Calculation of water surface profiles that are based on a standard hydraulic engineering analysis of the capacity of the stream channel and overbank areas to convey the regulatory flood.

(3)   Computation of a floodway required to convey this flood without increasing flood heights more than one (1) foot at any point.

(4)   Delineation of floodway encroachment lines within which no development is permitted that would cause any increase in flood height; and

(5)   Delineation of floodway fringe, i.e., that area outside the floodway encroachment lines but still subject to inundation by the base flood.

(c)   PURPOSE.

The purpose of this Article is to promote the public health, safety, and general welfare; to minimize those losses described in Section 16-401(b) of this Article; to establish or maintain the community’s eligibility for participation in the National Flood Insurance Program (NFIP) as defined in 44 Code of Federal Regulations (CFR) 59.22(a)(3); and to meet the requirements of 44 CFR 60.3(d) and K.A.R. 5-44-4 by applying the provisions of this Article to:

(1)   Restrict or prohibit uses that are dangerous to health, safety, or property in times of flooding or cause undue increases in flood heights or velocities;

(2)   Require uses vulnerable to floods, including public facilities that serve such uses, be provided with flood protection at the time of initial construction; and

(3)   Protect individuals from buying lands that are unsuited for the intended development purposes due to the flood hazard.

(Ord. 925)

(a)   LANDS TO WHICH THIS ARTICLE APPLIES. This Article shall apply to all lands within the jurisdiction of the city identified as numbered and unnumbered A Zones, AE, AO and AH Zones on the index map dated December 22, 2016, if the flood insurance rate map (FIRM) as amended, and any future revisions thereto. In all areas covered by this article, no development shall be permitted except through the issuance of a floodplain development permit, granted by the governing body of the city or its duly designated representative under such safeguards and restrictions as the governing body of the city or the designated representative may reasonably impose for the promotion and maintenance of the general welfare and health of the inhabitants of the community, and as specifically noted in Section 16-405 of the Code of the city.

(b)   COMPLIANCE. No development located within the special flood hazard areas of this community shall be located, extended, converted or structurally altered without full compliance with the terms of this article and other applicable regulations.

(c)   ABROGATION AND GREATER RESTRICTIONS. It is not intended by this article to repeal, abrogate or impair any existing easements, covenants, or deed restrictions. However, where this article imposes greater restrictions, the provisions of this article shall prevail. All other ordinances inconsistent with this article are hereby repealed to the extent of the inconsistency only.

(d)   INTERPRETATION. In their interpretation and application, the provisions of this article shall be held to be minimum requirements, shall be liberally construed in favor of the governing body and shall not be deemed a limitation or repeal of any other powers granted by Kansas statutes.

(e)   WARNING AND DISCLAIMER OF LIABILITY. The degree of flood protection required by this article is considered reasonable for regulatory purposes and is based on engineering and scientific methods of study. Larger floods may occur on rare occasions or the flood heights may be increased by manmade or natural cases, such as ice jams and bridge openings restricted by debris. This article does not imply that areas outside the floodway and flood fringe or land uses permitted within such areas will be free from flooding or flood damage. This article shall not create a liability on the part of the city, any officer or employee thereof, for any flood damages that may result from reliance on this article or any administrative decision lawfully made thereunder.

(f)    SEVERABILITY. If any section, clause, provision or portion of this article is adjudged unconstitutional or invalid by a court of appropriate jurisdiction, the remainder of this article shall not be affected thereby.

(Ord. 925)

(a)   FLOODPLAIN DEVELOPMENT PERMIT. A floodplain development permit shall be required for all proposed construction or other development, including the placement of manufactured homes, in the areas described in Section 16-403(a) of the Code. No person, firm, corporation, or unit of government shall initiate any development or substantial improvement or cause the same to be done without first obtaining a separate floodplain development permit for each structure or other development.

(b)   DESIGNATION OF FLOODPLAIN ADMINISTRATOR. The city engineer of the city is hereby appointed to administer and implement the provisions of this Article.

(c)   DUTIES AND RESPONSIBILITIES OF THE FLOODPLAIN ADMINISTRATOR. Duties of the floodplain administrator shall include, but not be limited to:

(1)   Review of all applications for floodplain development permits to assure that sites are reasonably safe from flooding and that the floodplain development permit requirements of this Article have been satisfied.

(2)   Review of all applications for floodplain development permits for proposed development to assure that all necessary permits have been obtained from federal, state or local governmental agencies from which prior approval is required by federal, state, or local law.

(3)   Review all subdivision proposals and other proposed new development, including manufactured home parks or subdivisions, to determine whether such proposals will be reasonably safe from flooding.

(4)   Issue floodplain development permits for all approved applications.

(5)   Notify adjacent communities and the Division of Water Resources, Kansas Department of Agriculture, prior to any alteration or relocation of a watercourse, and submit evidence of such notification to the Federal Emergency Management Agency (FEMA).

(6)   Assure that the flood-carrying capacity is not diminished and shall be maintained within the altered or relocated portion of any watercourse.

(7)   Verify and maintain a record of the actual elevation (in relation to mean sea level) of the lowest floor, including basement, of all new or substantially improved structures.

(8)   Verify and maintain a record of the actual elevation (in relation to mean sea level) that the new or substantially improved non-residential structures have been floodproofed.

(9)   When floodproofing techniques are utilized for a particular non-residential structure, the floodplain administrator shall require certification from a registered professional engineer or architect.

(d)   APPLICATION FOR FLOODPLAIN DEVELOPMENT PERMIT. To obtain a floodplain development permit, the applicant shall first file an application in writing on a form furnished for that purpose. Every floodplain development permit application shall:

(1)   Describe the land on which the proposed work is to be done by lot, block and tract, house and street address, or similar description that will readily identify and specifically locate the proposed structure or work.

(2)   Identify and describe the work to be covered by the floodplain development permit.

(3)   Indicate the use or occupancy for which the proposed work is intended.

(4)   Indicate the assessed value of the structure and the fair market value of the improvement.

(5)   Specify whether development is located in a designated flood fringe or floodway.

(6)   Identify the existing base flood elevation and the elevation of the proposed development.

(7)   Give such other information as reasonably may be required by the floodplain administrator.

(8)   Be accompanied by plans and specifications for proposed construction.

(9)   Be signed by the permittee or his authorized agent who may be required to submit evidence to indicate such authority.

(Ord. 723, Sec. 4)

(a)   General Standards.

(1)   No permit for floodplain development shall be granted for new construction, substantial improvement and other improvements, including the placement of manufactured homes, within any numbered or unnumbered A zones, AE, AO and AH zones, unless the conditions of this section are satisfied.

(2)   All areas identified as unnumbered A zones on the FIRM are subject to inundation of the 100-year flood; however, the base flood elevation is not provided. Development within unnumbered A zones on the FIRM is subject to all provisions of this article. If flood insurance study data is not available, the community shall obtain, review, and reasonably utilize any base flood elevation or floodway data currently available from federal, state or other sources.

(3)   Until a floodway is designated, no new construction, substantial improvement, or other development, including fill, shall be permitted within any unnumbered or numbered A zones, or AE zones on the FIRM, unless it is demonstrated that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood more than one (1) foot at any point within the community.

(4)   All new construction, subdivision proposals, substantial improvement, prefabricated structures, placement of manufactured homes, and other developments shall require:

(A)  Design or adequate anchorage to prevent flotation, collapse or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy;

(B)  Construction with materials resistant to flood damage;

(C)  Utilization of methods and practices that minimize flood damage;

(D)  All electrical, heating, ventilation, plumbing, air-conditioning equipment and other service facilities be designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding;

(E)   New or replacement water supply systems and/or sanitary sewage systems be designed to minimize or eliminate infiltration of flood waters into the systems and discharges from the systems into flood waters, and on-site waste disposal systems be located so as to avoid impairment or contamination from them during flooding; and

(F)   Subdivision proposals and other proposed new development, including manufactured home parks or subdivisions, located within special flood hazard areas are required to assure that:

(i)    All such proposals are consistent with the need to minimize flood damage;

(ii)   All public utilities and facilities, such as sewer, gas, electrical and water systems are located and constructed to minimize or eliminate flood damage;

(iii)  Adequate drainage is provided so as to reduce exposure to flood hazards; and

(iv)  All proposals for development, including proposals for manufactured home parks and subdivisions, of greater than five (5) acres or fifty (50) lots, whichever is lesser, include within such proposals base flood elevation data.

(v)   Storage, Material, and Equipment.

       (a)   The storage or processing of materials within the special flood hazard area which are, in time of flooding, buoyant, flammable, explosive or could be injurious to human, animal or plant life are prohibited.

       (b)   The storage of material or equipment may be allowed if not subject to major damage by floods, if firmly anchored to prevent flotation or if readily removable from the area within the time available after a flood warning.

(vi)  Nonconforming Use. A structure, or the use of a structure or premises, that was lawful before the passage or amendment of this article, but which is not in conformity with the provisions of this article, may be continued subject to the following conditions:

       (a)   If such structure, use or utility service is discontinued for twelve (12) consecutive months, any future use of the building shall conform to this article.

       (b)   If any nonconforming use or structure is destroyed by any means, including flood, it shall not be reconstructed if the cost is more than fifty percent (50%) of the pre-damaged market value of the structure. This limitation does not include the cost of any alteration to comply with existing state or local health, sanitary, building, safety codes, regulations or the cost of any alteration of a structure listed on the National Register of Historic Places, the State Inventory of Historic Places, or local inventory of historic places upon determination.

(b)   SPECIFIC STANDARDS.

In all areas identified as numbered and unnumbered A zones, AE and AH Zones, where base flood elevation data have been provided, as set forth in Section 16-405(a)(2) of the Code of the City, the following provisions are required:

(1)   Residential Construction. New construction or substantial improvements of any residential structures, including manufactured homes, shall have the lowest floor, including basement, elevated a minimum of one (1) foot above base flood elevation. The elevation of the lowest floor shall be certified by a licensed land surveyor or professional engineer.

(2)   Non-Residential Construction. New construction or substantial improvements of any commercial, industrial, or other non-residential structures, including manufactured homes, shall have the lowest floor, including basement, elevated a minimum of one (1) foot above the base flood elevation or, together with attendant utility and sanitary facilities, be dry floodproofed to a minimum of one (1) foot above the base flood elevation. A registered professional engineer or architect shall certify that the standards of this subsection are satisfied. The elevation of the lowest floor shall be certified by a licensed land surveyor or professional engineer. Such certification shall be provided to the floodplain administrator as set forth in Section 16-404(c)(7)(8) and (9) herein.

(3)   New Construction. Require, for all new construction and substantial improvement, that fully enclosed areas below the lowest floor used solely for parking of vehicles, building access, or storage in an area other than a basement and that are subject to flooding shall be designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry and exit of flood waters. Designs for meeting this requirement must either be certified by a registered professional engineer or architect or meet or exceed the following minimum criteria:

(A)  A minimum of two (2) openings having a total net area of not less than one (1) square inch for every square foot of enclosed area subject to flooding shall be provided; and

(2)   The bottom of all openings shall be no higher than one (1) foot above grade. Openings may be equipped with screens, louvers, valves, or other coverings or devices, provided that they permit the automatic entry and exit of flood waters.

(c)   MANUFACTURED HOMES.

(1)   All manufactured homes to be placed within all unnumbered and numbered A zones, AE, and AH zones on the community’s FIRM shall be required to be installed using methods and practices that minimize flood damage. For the purposes of this requirement, manufactured homes must be elevated and anchored to resist flotation, collapse or lateral movement. Methods of anchoring may include, but are not limited to, use of over-the-top or frame ties to ground anchors. This requirement is in addition to applicable state and local anchoring requirements for resisting wind forces.

(2)   Require manufactured homes that are placed or substantially improved within unnumbered or numbered A zones, AE, and AH zones on the Community’s FIRM on sites:

(A)  Outside of manufactured home parks or subdivisions;

(B)  In a new manufactured home park or subdivision;

(C)  In an expansion to and existing manufactured home park or subdivision; or

(D)  In an existing manufactured home park or subdivision on which a manufactured home has incurred substantial damage as the result of a flood, be elevated on a permanent foundation such that the lowest floor of the manufactured home is elevated a minimum of one (1) foot above the base flood elevation and be securely attached to an adequately anchored foundation system to resist flotation, collapse, and lateral movement. The elevation of the lowest floor shall be certified by a licensed land surveyor or professional engineer.

(3)   Require that manufactured homes to be placed or substantially improved on sites in an existing manufactured home park or subdivision within all unnumbered A zones, AE and AH zones on the community’s FIRM, that are not subject to the provisions of Section 16-404(c)(2) of the Code of the City, be elevated so that either:

(A)  The lowest floor of the manufactured home is a minimum of one (1) foot above the base flood level; or

(B)  The manufactured home chassis is supported by reinforced piers or other foundation elements of at least equivalent strength that are no less than thirty-six (36) inches in height above grade and be securely attached to an adequately anchored foundation system to resist flotation, collapse, and lateral movement. The elevation of the lowest floor shall be certified by a licensed land surveyor or professional engineer.

(d)   FLOODWAY. Located within areas of special flood hazard established in Section 16-402(a) of the Code of the City are areas designated as floodways. Since the floodway is an extremely hazardous area due to the velocity of flood waters that carry debris and potential projectiles, the following provisions shall apply:

(1)   The community shall select and adopt a regulatory floodway based on the principle that the area chosen for the regulatory floodway must be designed to carry the waters of the base flood without increasing the water surface elevation of that flood more than one (1) foot at any point.

(2)   The community shall prohibit any encroachments, including fill, new construction, substantial improvements, and other development within the adopted regulatory floodway unless it has been demonstrated through hydrologic and hydraulic analyses performed in accordance with standard engineering practice that the proposed encroachment would not result in any increase in flood levels within the community during the occurrence of base flood discharge.

(3)   If Section 16-405(d)(2) is satisfied, all new construction and substantial improvement shall comply with all applicable flood hazard reduction provisions of Section 16-405 of the Code.

(4)   In unnumbered A zones, the community shall obtain, review and reasonably utilize any base flood elevation or floodway data currently available from federal, state, or other sources as set forth in Section 16-405(a)(2) of the Code.

(e)   RECREATIONAL VEHICLES. Require that recreational vehicles placed on sites within all unnumbered and numbered A Zones and AE Zones on the community’s FIRM either:

(1)   be on the site for fewer than one hundred eighty (180) consecutive days;

(2)   be fully licensed and ready for highway use*; or

(3)   meet the permitting, elevation, and anchoring requirements of this Article for manufactured homes.

*A recreational vehicle is ready for highway use if it is on its wheels or jacking system, is attached to the site only by quick-disconnect type utilities and security devices and has no permanently attached additions.

(Ord. 925)

(a)   MAIZE BOARD OF ZONING APPEALS. The Maize board of zoning appeals, as established by the city, shall hear and decide appeals and requests for variances from the floodplain management requirements of this Article.

(b)   RESPONSIBILITY OF BOARD OF ZONING APPEALS. Where an application for a floodplain development permit is denied by the floodplain administrator, the applicant may apply for such floodplain development permit directly to the appeal board, as defined in section 16-406(a). The appeal board shall hear and decide appeals when it is alleged that there is an error in any requirement, decision, or determination made by the floodplain administrator in the enforcement or administration of this Article.

(c)   FURTHER APPEALS. Any person aggrieved by the decision of the appeal board or any taxpayer may appeal such decision to the district court of the county as provided in K.S.A. 12-759 and 12-760.

(d)   FLOODPLAIN MANAGEMENT VARIANCE CRITERIA. In passing upon such applications for variances, the appeal board shall consider all technical data and evaluations, all relevant factors, standards specified in other sections of this Article, and the following criteria:

(1)   Danger to life and property due to flood damage;

(2)   Danger that materials may be swept onto other lands to the injury of others;

(3)   Susceptibility of the proposed facility and its contents to flood damage and the effect of such damage on the individual owner;

(4)   Importance of the services provided by the proposed facility to the community;

(5)   Necessity to the facility of a waterfront location, where applicable;

(6)   Availability of alternative locations, not subject to flood damage, for the proposed use;

(7)   Compatibility of the proposed use with existing and anticipated development;

(8)   Relationship of the proposed use to the comprehensive plan and floodplain management program for that area;

(9)   Safety of access to the property in times of flood for ordinary and emergency vehicles;

(10) Expected heights, velocity, duration, rate of rise and sediment transport of the floodwaters, if applicable, expected at the site; and,

(11) Costs of providing governmental services during and after flood conditions, including maintenance and repair of public utilities and facilities such as sewer, gas, electrical, and water systems, streets, and bridges.

(e)   CONDITIONS FOR APPROVING FLOODPLAIN MANAGEMENT VARIANCES.

(1)   Generally, variances may be issued for new construction and substantial improvement to be erected on a lot of one-half (1/2) acre or less in size contiguous to and surrounded by lots with existing structures constructed below the base flood level, providing items (2) through (6) below have been fully considered. As the lot size increases beyond the one-half (1/2) acre, the technical justification required for issuing the variance increases.

(2)   Variances may be issued for the reconstruction, rehabilitation, or restoration of structures listed on the National Register of Historic Places, the State Inventory of Historic Places, or local inventory of historic places upon determination, provided the proposed activity will not preclude the structure’s continued historic designation.

(3)   Variances shall not be issued within any designated floodway if any significant increase in flood discharge would result.

(4)   Variances shall only be issued upon a determination that the variance is the minimum necessary, considering the flood hazard, to afford relief.

(5)   Variances shall only be issued upon: a.) showing of good and sufficient cause, b.) determination that failure to grant the variance would result in exceptional hardship to the applicant, and c.) determination that the granting of a variance will not result in increased flood heights, additional threats to public safety, extraordinary public expense, create nuisances, cause fraud on or victimization of the public, or conflict with existing local laws or ordinances.

(6)   A community shall notify the applicant in writing over the signature of a community official that: a.) the issuance of a variance to construct a structure below base flood level will result in increased premium rates for flood insurance up to amounts as high as $25 for $100 of insurance coverage, and b.) such construction below the base flood level increases risks to life and property. Such notification shall be maintained with the record of all variance actions as required by this Article.

(Ord. 723, Sec. 6)

Violation of the provisions of this Article or failure to comply with any of its requirements (including violations of conditions and safeguards established in connection with granting of variances) shall constitute a misdemeanor. Any person who violates this Article or fails to comply with any of its requirements shall, upon conviction thereof, be fined not more than One Thousand Dollars ($1,000.00), and, in addition, shall pay all costs and expenses involved in the case. Each day such violation continues shall be considered a separate offense. Nothing herein contained shall prevent the city or other appropriate authority from taking such other lawful action as necessary to prevent or remedy any violation.

(Ord. 723, Sec. 7)

The regulations, restrictions, and boundaries set forth in this Article may from time to time be amended, supplemented, changed, or appealed to reflect any and all changes in the National Flood Disaster Protection Act of 1973; provided, however, that no such action may be taken until after a public hearing in relation thereto, at which parties of interest and citizens shall have an opportunity to be heard. Notice of the time and place of such hearing shall be published in the official city newspaper, and at least twenty (20) days shall elapse between the date of publication and the public hearing. A copy of such amendments will be provided to the FEMA Region VII office. The regulations of this Article are in compliance with the NFIP regulations.

(Ord. 723, Sec. 8)

Should any court declare any section, clause or provision of this Article 4 to be unconstitutional, such decision shall affect only such section, clause or provision so declared unconstitutional and shall not affect any other remaining section, clause or provision of this Article 4.

(Ord. 723, Sec. 9)